尼亚加拉(大瀑布)华人网™

 找回密码
 注册
查看: 1996|回复: 0

vibram five fingers shoes -Beijing Bus Rapid Transit lanes through areas designa

[复制链接]
发表于 2011-7-21 04:20 | 显示全部楼层 |阅读模式
联系我时,请说明是从哪里看到的。
北美华人新生活

尼亚加拉免费英语角班

心理热线

(Editor: UN009) microblogging Recommended* h; j4 W' J+ i) b
reporter learned yesterday from the Municipal Transportation Commission, Beijing Tong Expressway bus lane will be applied starting this evening program, scheduled for May 24 was officially opened. There will then be 18 lines on the bus drove lane, both directions at the same time opening of the new community commuter express commuter bus rapid transit corridor in Beijing will pass the initial formation. Jing Tong Expressway will become the city's first bus lane areas designated in the fast way. Hang Deng reporter ! y6 I2 L* ?( Q

% N/ Y; F0 m" h2 v! r9 @
# D+ a, A& q/ t& {8 @
0 G4 S2 I" |* O0 C7 p2 n. ~) J>> enable time delimited
0 Z5 @2 ?) @6 h2 k' u9 O # I' |9 N9 H3 g% a  u9 e
Bus Road outside the bus banned - m" `/ ~5 x' c7 X- S  j9 S+ e
6 h; k6 P3 R( z5 a
According to the city to pay the HKMA introduced, since May 19 night, the Beijing Tong Expressway bus lane plan became effective and was officially opened May 24, will be the continuation of the longest city bus lanes. Prior to the May 24, although some sections of Beijing Tong Expressway has delimit the bus lanes,vibram online, and installation of monitoring equipment, but the current provisions shall continue to pass.
  A. Z& ?, ^8 Q7 O5 L$ A" ?
/ S, s- @6 l, N" M+ U5 C According to reports, bus lane expressway in Beijing, the main road through the inside lane,vibram five, the direction of Beijing will be the starting point in the dual-west, east end of the Fourth Ring Road in the four exit west of the benefits a total length of 8.6 km, opening time is 7 pm to 9 pm; the direction of the city starting at the bridge from west to east Sihui second exit ramp, west end of the double will be a total length of 8.8 kilometers, enabling time of 17 am to 19:00. 5 I1 J) `) A7 i1 U! E3 E
* @- E- q+ ^, {2 _
to protect the safety and smoothness bus lane, bus lanes opening period, except for public transport vehicles to pass, and a top speed of no more than 80 km. The use of time, the most left lane is still fast lane, not driving the bus for the bus if the violation of the provisions of the punishment, the relevant authorities have not given a clear response. 3 w, J( ?9 K( l* e( P

8 R3 W( V0 o  a1 ~ from May 24 onwards, in the morning and evening peak specific period of time,five fingers, there will be 18 bus lines to Beijing drove through Expressway bus lanes, and the new direction of the community opened two commuter express train, built Beijing Tongzhou new city and linking urban commuter bus rapid transit corridor on the ground.
% R* w4 u% z; N 6 P9 x% Y) _) c: E5 b
>> control
/ K! M( r9 N+ d7 G! G/ ]5 N
( l4 }5 P5 L' \/ Z5 o) @. m" K5 I newly installed more than 300 sets of monitoring equipment . X: U$ m( v% E
0 W0 |8 v" x/ J- h7 H
City law to pay the HKMA said in order to improve road management and control capability, to prevent the illegal occupation of social vehicle bus lanes, pass the traffic control department in Beijing, 20 new sets of Expressway fixed illegal surveillance equipment, 10 sets of TV monitoring system and buses passing through the installation of 300 sets of mobile illegal monitoring equipment, and bus lane on comprehensive coverage of scientific and technological means . Currently, more devices have been installed.
2 h/ r* e) w& q* v. F2 G& t
2 `  K+ s8 W/ s the traffic control department of law enforcement and through off-site means of the combination of field of law enforcement, bus lane on the illegal occupation of a vehicle given to a fine of 200 yuan each time penalty. ) ], t1 m6 K6 L4 N2 |

# l) V4 {, z" R$ j3 p>> sparse block
/ F$ F3 g: T: o# {8 a , N# a0 P- c+ f; s
two projects to ensure the speedy passage of ( C! [7 ?; T; G1 d8 I. r
  i# N$ t: @7 k; F" P6 I) Y0 Q
Jing Jing Tong Tong Road, Rapid bus after the opening of private car travel may be affected. Beijing Tong fast way to ensure the overall capacity to ease the traffic pressure on the main road, traffic and road administrative department implemented the Fast Way sparse block Jingtong Guangqu diversion works and works.
" r9 B, y- [  J8 D
0 V* b" i7 }# F1 c. P$ D City Traffic Management Bureau said that to ease congestion and improve road capacity, the traffic department of the Beijing Tong Expressway and surrounding roads were detailed investigation and research to develop the engineering rehabilitation programs, including Beijing Tong Expressway widening roads and some exports, opening the emergency exit, turn gate; Guangqu eastward road reconstruction; construction and orientation of the Fifth Ring Road ramp and so on. 7 U* [8 o+ e- U1 }) W! {

0 w" e9 D; @. q9 S6 l taking into account the bus lane change after the opening of the traffic, the traffic control department has enacted a special external diversion programs, the use of Guangqu eastward Jinghagaosu Road, Chaoyang Road, Chaoyang North Road, Ring Road , Ring Road, a massive shunt. In addition, Beijing will pass quickly in the first-line main and side roads and adjacent roads, focusing on the bridge area, morning and evening peak periods to increase investment in police, strengthen the control of maintenance ease and peripheral cards.
; a) q# G) z/ v' K! v
/ m9 U: y5 M5 r9 S6 G! \4 V  w$ w>> of
9 ^0 V0 D! u* T. M8 ^# u, Q * ~1 ^1 e5 K# l
1 Batong full rate to 114%
, D( w+ s  O8 a' v' B ( f, ~/ _" L/ E
City Transportation Commission spokesman Xiao-Song Li said, in order to enhance the attractiveness of public transportation, the need to improve bus access speed. Therefore, the transport sector has been envisaged Circle whether bus lanes can be opened, and the opening of the four directions East and West city bus corridor.
/ R$ W! V2 d" r' c7 h 4 P5 F: G1 J: r% T) D* O9 j% H
Transit Road, Beijing Tong Expressway opened, it will ease rail traffic congestion and operating pressure Batong.
  P% e5 d) B+ R7 _' v
3 r0 h# v8 F& H( r( P  _( ^ 2010 年 Batong daily traffic was 250,mbt sale,300 passengers, up to more than 30 million passengers at peak hour trains full rate of more than 130%,vibram five fingers shoes, multiple sites Caiqu morning and evening peak limiting measures. It is estimated that Beijing commuter bus rapid transit corridor through open after the morning rush hour 04,700 people turned a potential passenger bus into the city from the track, track Batong load factor decreased from 135% to 114%.
0 Y; a/ ~2 K, Y4 i4 {) x 9 {- Z, k7 }* }, a& X# s% Z& N
2 Road, take the bus can save half the time ; f# y, F* X9 s8 l1 c

) L5 T$ n6 W) F% o9 r Public Transport Group, said that Beijing Public Transport Road Expressway through the opening, an estimated 8 million people to enjoy the convenience of public transportation channel. 667 Road, 668 Road, 669 Road, Beijing and other 18 onto the bus through quick way to increase the peak capacity for a single class, as early as the direction of the peak increase of 17 trips into the city, capacity increase of 4% and evening peak increase of 9 trips out of town direction, capacity increase of 5 %. Line with cars from the current 738 to 798. 2 p( q# W# Y( `  N0 e( S' L# r! E
0 |2 t0 o. t* s7 G
the same time, Wuyihuayuan, DABEIYAO, four benefits, and other key areas Beiyuan each morning and evening peak hours with six vehicles, change at any time to increase passenger capacity. ) [6 Q! I# _5 o! S1 ], c$ s* T3 \

, `& ]1 O' H( I% B2 e Earlier, Public Transport Group has been to delimit the sections of road transportation vehicle load factor, speed and run time of investigation. Survey, from the early peak to four Huidong Baliqiao, bus an average of 25 minutes running time, evening peak by four Huidong to Baliqiao, bus an average of 20 minutes running time. In accordance with the bus speed and bus path length is estimated that areas designated bus road, the bus running time from the current 20 to 25 minutes, reduced to an average of 8 to 10 minutes, the overall savings in half the time.
4 v) P' D! O+ `( Z
+ H/ c4 U1 _* d1 w. {, G of: Tang Hang 2 }, Y4 u" U- D6 [/ N
  * E! u( @# H9 K  \3 y
   -Got Ringing in the Ears- Its Called Tinnitus &la
1 G" {2 m* b  D: J) H; g  - a+ X: e' R- M: h) M6 i4 @
   tods -Best service when buy the Herve Leger Dress_710
3 J' {" C( h! o+ }; S+ P  4 X1 S$ }1 f6 X: Q. ~. s+ i; G
   tods online -Graceful Herve Leger Dresses_152* _1 h4 v% F  b) W
  
7 W% j  q* u3 s+ ` Part of Mr. Hare’s spring 2010 collection seen here, the Capote is not a shoe to be missed. The shoes are named for the infamous author and social darling of the mid-20th century. Channel Capote’s sense of aestheticism and proclivity for black-tie events in these shoes by Mr. Hare. A combination of suede and black patent leather, these are sure to cause a stir as soon as you walk in. Grab your own pair from oki-ni here, but be aware – this is only a pre-order. They don’t ship until Feburary 2010.
您需要登录后才可以回帖 登录 | 注册

本版积分规则

广告合作(Contact Us)|关于我们|小黑屋|手机版|Archiver|尼亚加拉(大瀑布)华人网

GMT-5, 2024-11-14 06:25

Powered by Discuz! X3.4 Licensed

© 2001-2013 Comsenz Inc.

快速回复 返回顶部 返回列表